Installation
YOUR HULL SPEAKS
In-hull mount. Maximum transfer.
Five steps to optimal acoustic coupling. In-hull mounting below the waterline is the recommended method.
Developed using published research on fish acoustic behavior
Back in stock — ready to ship
New inventory just landed. Order today and your Tuna Magnet ships from current stock — no waitlist.
Step By Step
Your Hull Becomes The Speaker
In-hull mounting delivers the strongest acoustic coupling. Drop-in deployment is available when hull access is limited.
Your hull becomes the speaker.
The mineral-oil layer removes air between the Tuna Magnet and the fiberglass, allowing low-frequency vibration to transfer efficiently into the water.
Set aside time for sealant curing before you fill and finish the installation.
-
01
Choose the installation area
Select a mounting location inside the hull below the water line for direct acoustic transfer through the hull into surrounding water.
-
02
Apply the sealant
Apply a continuous bead of marine-grade sealant around the mount site, leaving a small opening unsealed for filling.
-
03
Mount the unit
Press the unit firmly against the hull surface, ensuring full contact without trapped air pockets.
-
04
Fill the cavity with oil
Using a syringe, slowly fill the gap with white mineral oil until all air is displaced.
-
05
Final sealing
Remove the filling tube and seal the remaining opening for optimal acoustic coupling.
Keep it onboard
Get the in-hull installation guide.
Enter your email for the printable PDF and offshore setup updates from Gravity Fishing.
Q & A
Installation Questions
What is the recommended installation method?
In-hull mounting below the waterline is recommended for maximum acoustic transfer.
What coupling fluid should I use?
White mineral oil is recommended for in-hull installation.
How do I prep the hull contact area?
Sand lightly, degrease, and clean with isopropyl alcohol or acetone.
Get Your Tuna Magnet
Marine-grade underwater acoustic technology engineered for chunk fishing and trolling.
€399Marine-grade build · Ready to ship · Offshore engineered